What are the issues to pay attention to when assembling steel shed steel structure devices for building steel structure warehouses? 1. Steel columns are generally connected to the b......

Product Description

What are the issues to pay attention to when assembling steel shed steel structure devices for building steel structure warehouses?

1. Steel columns are generally connected to the base using pre embedded anchor bolts. Therefore, before installing the steel columns, the scale between the column base bolts should be checked, the length of the exposed surface of the base, whether the elevation of the top surface of the base meets the planning requirements, and whether the threads of the column base anchor bolts are damaged. Methods are generally adopted during the construction of the base to protect the column base anchor bolts and their threads from being damaged.

2. Before installing the steel structure, all components should be inspected to ensure that their quantity, length, straightness, and the scale between the bolt holes at the device nodes meet the planning requirements; Defects that occur during production and deformations that occur during transportation should be corrected on the ground and properly resolved.

3. When lifting steel structures, appropriate methods should be adopted to avoid excessive bending and twisting deformation, and corresponding pads should be added to the contact area between the rope buckle and the components to prevent damage to the components.

4. According to the lifting ability of the construction site installation machinery, assemble large installation units on the ground to reduce the workload of high-altitude operations.

5. After the steel structure is lifted into position, the support and other connecting components should be securely fastened in a timely manner to determine the stability of the structure.

6. All lifting of the upper structure needs to be carried out after the lower structure is in place, calibrated, and the supporting components are securely fastened.


 
 
 

Botou Yuyuan Steel Structure Co., Ltd

Contact: Peter Gao
Phone: +86 15822013355
Email: yysteelstructure01@163.com
Address:Development zone, Tangshan city , Hebei province, China
 

Copyright © 2024-2025 http://www.yysteelwarehouse.com. All Rights Reserved Hebei Yuyuan Steel Structure Co., Ltd. All Rights Reserved.