mobi
 
 
contact
Current Location Current Location:HOME > PRODUCTS > Warehouse And Workshop >
 
Prefab storage sheds for sale steel building construction steel warehouse

Prefab storage sheds for sale steel building construction steel warehouse

The prefabricated warehouse steel structure building steel warehouse needs to go through two stages: factory production and on-site installation. The production and installation are......

Product Description

The prefabricated warehouse steel structure building steel warehouse needs to go through two stages: factory production and on-site installation. The production and installation are generally carried out by two grassroots units (production workshop and installation project department) under the prefabricated warehouse steel structure building steel warehouse company, and sometimes may be completed separately by the manufacturing plant and installation company (subcontracting). Supervising engineers should fully attach importance to the supervision work during the production stage, and, like other types of engineering supervision work, effectively carry out pre control and in-process control. They should inspect each process and sub item carefully, timely, strictly and in place. To avoid the erroneous work method of relaxing the supervision of the factory production process and relying solely on on-site acceptance after the completion of components. This is especially important when the production unit is far from the project location.

The supervision work during the steel structure installation stage mainly involves supervising the operation of the internal management system and quality assurance system of the contracting unit, supervising the implementation of various technical and organizational measures in the construction organization design, and strictly following the current national steel structure regulations and standards for construction. The supervision work during the steel structure installation stage should focus on the following aspects: the rationality and implementation of the installation plan, installation measurement, connection of high-strength bolts, installation welding quality, actual measurement of installation dimension deviation, painting, etc. Supervision work should strengthen on-site inspection, parallel inspection, and on-site supervision, especially in cases where the quality of some steel structure construction units is low and the construction is still not standardized. Effectively carrying out on-site inspection and on-site supervision is more practical for ensuring the construction quality of prefabricated warehouse steel structure buildings and steel warehouses.


 
 
 

Botou Yuyuan Steel Structure Co., Ltd

Contact: Peter Gao
Phone: +86 15822013355
Email: yysteelstructure01@163.com
Address:Development zone, Tangshan city , Hebei province, China
 

Copyright © 2024-2025 http://www.yysteelwarehouse.com. All Rights Reserved Hebei Yuyuan Steel Structure Co., Ltd. All Rights Reserved.